Laserfiche WebLink
-4- <br /> 12. Primary future(Post-mining)land use(check one): (� <br /> LICropland(CR) n Pastureland(PL) I I General Agriculture(GA) <br /> n Rangeland(RL) Ei Forestry(FR) Wildlife Habitat(WL) <br /> Fl Residential(RS) E Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) [1 Solid Waste Disposal(WD) <br /> 13. Primary-present land use(check one : <br /> 0 Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> .II Rangeland(RL) Forestry(FR) [ Wildlife Habitat(WL) <br /> BResidential(RS) LI Recreation(RC) U Industrial/Commercial(1C) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Mining will occur with a combination of bulldozer/track hoe/scraper/front end loaders and loaded into highway trucks using a front-end loader. <br /> 15. On Site Processing: I I Crushing'Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): n/a <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area. n/a <br /> 16. Description of Amendment or Conversion: <br /> if you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> The applicant is seeking to convert the existing 110(c) permit to a 112(c) permit in order to <br /> expand the permitted acreage from 7.89 acres to a total of 40 acres. The type of mining <br /> (extraction of pit r-e&borrow) <br />