Laserfiche WebLink
VOLUME 1 (CONTINUED) <br />0 TITLE PAGE NO. <br />Rule 4.06 TODSOH <br />4.06.1 General Requirements 4.01-6 <br />4.06.2 Removal 4.01-7 <br />4.06.3 Storage 4.01-7 <br />4.06.4 Redistribution 4.01-7 <br />4.06.5 Reconditioning 4.01-8 <br />Rule 4.07 Sealing of Drilled Holes and Underground Openings 4.01-8 <br />Rule 4.08 Use of Explosives 4.01-8 <br />Rule 4.09 Disposal of Excess Spoil and Underground Development Waste 4.01-8 <br />Rule 4.10 Coal Processing Waste Banks 4.01-8 <br />Rule 4.11 Coal Processing Waste <br />4.11.1 Burning 4.01-8 <br />4.11.2 Burned Waste Utilization 4.01-8 <br />4.11.3 Return to Underground Workings 4.01-9 <br />4.11.4 Disposal of Non-Coal Waste 4.01-9 <br />• 4.11.5 Dams and Embankments 4.01-9 <br />Rule 4.12 Slides and Other Damage 4.01-9 <br />Rule 4.13 Contemporaneous Reclamation 4.01-9 <br />Rule 4.14 Backfilling and Grading 4.01-9 <br />Rule 4.15 Revegetation Reauirements <br />4.15.1 General Requirements 4.01-9 <br />4.15.2 Use of Introduced Species 4.01-9.1 <br />4.15.3 Seeding and Planting 4.01-10 <br />4.15.4 Mulching and Other Soil Stabilizing Practices 4.01-10 <br />4.15.5 Grazing 4.01-10 <br />4.15.6 Field Trials 4.01-10 <br />4.15.7 Determining Revegetation success: General Requirements and <br /> Standards 4.01-10 <br />4.15.8 Revegetation Success Criteria 4.01-10 <br />4.15.9 Revegetation Success Criteria: Cropland 4.01-11 <br />4.15.10 Revegetation Success Criteria: Previously Mined Lands; Areas <br /> to be Developed for Industrial or Residential Use 4.01-11 <br />0 <br />Permit Renewal RN07-05 iv 01/22/09