Laserfiche WebLink
PAR RESPONSE <br />Table 18a <br />DISCHARGE FROM THE N0. 5 MINE PONDS - Part 1 <br />DATE FLOW IN GPM DATE FLOW IN GPM <br />01/03/85 31 01/10/85 40 <br />01/17/85 40 01/25/85 220 <br />01/30/85 566 02/07/85 1388 <br />02/14/85 1163 02/21/85 31 <br />02/27/85 1666 03/07/85 40 <br />03/14/85 54 03/20/85 7g0 <br />03/28/85 31 04/04/85 1338 <br />04/10/85 938 04/17/85 31 <br />04/24/85 373 05/02/95 1468 <br />05/08/85 31 05/16/85 lg <br />05/25/85 1221 05/31/85 31 <br />• 06/06/85 1338 06/14/85 1348 <br />06/20/85 1338 06/28/85 p <br />07/03/85 1046 07/12/85 1046 <br />07/18/85 1666 07/26/85 31 <br />08/01/85 4.5 08/08/85 1338 <br />08/14/85 1046 08/22/85 372 <br />08/28/85 1046 09/05/85 1221 <br />09/12/85 220 09/18/85 790 <br />09/27/85 0 10/03/85 1221 <br />10/03/85 1221 10/11/85 3 <br />10/18/85 1338 10/24/85 1338 <br />10/30/85 1221 <br />11/22/85 61 11/27/85 1338 <br />12/06/85 566 12/13/85 234 <br />12/19/85 1402 12/26/85 1501 <br />• Mean = 676 gpm <br />