My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-26_PERMIT FILE - M2024005
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024005
>
2024-02-26_PERMIT FILE - M2024005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 7:48:13 AM
Creation date
2/27/2024 11:12:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024005
IBM Index Class Name
Permit File
Doc Date
2/26/2024
Doc Name
Application
From
Sedwick County
To
DRMS
Email Name
JLC
JLE
SMS
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sedgwick County Road and Bridge Gravel Pit Page 21 <br /> 112(c) Operation Reclamation Permit February 25, 2024 <br /> Since the amount of backfill material that will be extracted is unknown it will be estimated by <br /> assuming that 10%of the weight of gravel extracted will be backfill. <br /> Backfill Volume=Gravel Volume*0.10=67,300 cubic yards*0.10=6,730 cubic yards. <br /> Total Cost of Backfill= $42,938 <br /> Cost of backfill earthworks for each phase=total cost/4=$10,7344.6.3 Cost of Seed Mix <br /> Buffalo Brand seed mix, a local seed grower, has provided a quote for the cost of seed mix. It is <br /> $16.00/lb (Appendix F). Using 20 lbs per acre seeding rate suggested by the NRCS and assuming <br /> 5.7 acres of land to be reclaimed and using the total cost of the seed mix will be $7,296. The cost <br /> of seeding an individual phase will be $2,432. <br /> 12.3 Cost of Seeding <br /> The South Platte Natural Resources Conservation district rent drill seeders at $50/day. It will be <br /> assumed that only one day of use will be required to drill-seed each phase and that will include a <br /> laborer working at $30/hr for 8 hours. <br /> Cost of Seeding Equipment for single phase=$50 <br /> Total Cost of Seeding Equipment=Phase Cost*3=$150 <br /> Cost of Seeding Labor for single phase=8hrs*30/hr=$240 <br /> Total Cost of Seeding Labor=Phase Cost*3=$720 <br /> Total Cost of Seeding=$870 <br /> 12.4 Cost of Fertilization <br /> For the cost estimate, it is assumed that no fertilization will be done. <br /> 12.5 Total Estimated Reclamation Cost <br /> Total Cost=$31,912 <br /> Z.IProjects1Sedgwzck County12023 Gravel Pd Permut,ng\Perma AEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.