My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-26_PERMIT FILE - M2024005
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024005
>
2024-02-26_PERMIT FILE - M2024005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 7:48:13 AM
Creation date
2/27/2024 11:12:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024005
IBM Index Class Name
Permit File
Doc Date
2/26/2024
Doc Name
Application
From
Sedwick County
To
DRMS
Email Name
JLC
JLE
SMS
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sedgwick County Road and Bridge Gravel Pit Page 4 <br /> 112(c) Operation Reclamation Permit February 25, 2024 <br /> Phase 3: <br /> Description: Removal of the top of dune south of first 2 dunes dune that progresses <br /> downward and outward to contour outlined in red in Figure 5. <br /> Area: 1.78 acres <br /> Location: <br /> Top of Dune: Lat: 40.948458° Long: -102.238900° <br /> Volume Extracted: 35,636 cubic yards <br /> Depth of Extraction from top of dune: 26 feet <br /> 4.5 Stockpile Handling <br /> Figure 3 shows the proposed locations of stockpiles. <br /> Topsoil <br /> Each mining phase will consist of the following, 6-12 inches of topsoil removed and stockpiled <br /> for reclamation use. Woody vegetation will be removed from topsoil prior to stockpiling. <br /> Stockpiles of topsoil will be located away from mining areas so that they are not disturbed prior to <br /> reclamation activities as shown on Figure 3. Stockpiles of topsoil shall not be more than 2 feet in <br /> height to allow enough air exposure to maintain soil quality. Stockpiles of topsoil shall not be <br /> compacted. Individual stockpiles of topsoil will be stabilized against erosion.Erosion stabilization <br /> of topsoil stockpiles shall be done using temporary seeding, the seed and seeding rate to be used <br /> depending on time of year is shown in Table 1 below. <br /> Overburden <br /> The 1993 Geotechnical report from empire laboratories indicates that there is a clay stratum that <br /> is approximately 3 feet thick. This clay will be stockpiled as overburden material and backfilled <br /> after mining operations have ceased. The amount of overburden material to be removed is <br /> estimated to be 15%. Overburden stockpiles will be located away from mining areas as indicated <br /> in Figure 3. Stockpiles of overburden shall be approximately 10 feet in height and the approximate <br /> lateral dimensions are shown in Figure 3. Erosion stabilization of overburden stockpiles shall be <br /> done using temporary seeding, the seed and seeding rate to be used depending on time of year is <br /> shown in Table 1 below. <br /> Z:I P%/eclslSedgwrck County12023 Gravel Pa Permatingl Permit AEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.