My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-26_REVISION - M1977211
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977211
>
2024-02-26_REVISION - M1977211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2024 9:41:52 AM
Creation date
2/27/2024 9:33:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
Revision
Doc Date
2/26/2024
Doc Name
Request for Surety Reduction
From
Castle Aggregates -c/o River Bend Industries
To
DRMS
Type & Sequence
SR3
Email Name
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Pikeview Quarry <br /> `"" Date: 2/21/2024 <br /> COR# 23087 <br /> Rth:osing <br /> Rev 3-Change Order Request # 10 <br /> Owner: <br /> Jerald Schnabel-Castle Concrete <br /> Change Order Description: <br /> Borrow Areas <br /> Description Quantity Unit Unit Price Amount <br /> Mobilization 1 LS $20,000.00 $20,000.00 <br /> South Slopes,Shop and,lower(includes a <br /> simultaneous loading operation)Approx Qty 400,000 CY $5.85 $2,340,000.00 <br /> Initial Pioneering, Build and remove haul <br /> roads and safety berms 1 LS $45,000.00 $45,000.00 <br /> Place and compact material moved by Castle <br /> Concrete 65,000 CY $1.50 $97,500.00 <br /> Total change request $2,502,500.00 <br /> Stipulations/Exclusions/Terms <br /> Dwire makes no guarantee of quanitity or quality of material <br /> May Include simultaneous loading of coal like material and crusher fines <br /> Includes stripping of organic matter and push to edges <br /> Excludes material that cannot be ripped by a D9 dozer,full depth dual shank,without spinning tracks or stalling <br /> Excludes material that cannot be loaded by excavator bucket with full load in a single pass <br /> Dwire will continue to explore for more material within project limits, within a reasonable distance of the <br /> proposed borrow areas. <br /> Excludes relocation of topsoil piles-By others-These will need moved ASAP <br /> Excludes relocation of rip rap,other materials,fuel tanks and other stuff in between lower borrow and south <br /> slopes that needs to be removed ASAP <br /> 8,000 CY will still be invoiced at contract price from South Slopes <br /> 2,000 CY will still be invoiced at contract price from Shop area <br /> Dwire may perform some of the work with scrapers <br /> Adam gi(y 2/21/2024 <br /> Project Manager-Dwire Earthmoving LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.