My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-27_REVISION - M1988090
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988090
>
2024-02-27_REVISION - M1988090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2024 9:23:16 AM
Creation date
2/27/2024 8:02:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988090
IBM Index Class Name
Revision
Doc Date
2/27/2024
Doc Name
Notice of Surety Increase
From
DRMS
To
Jerry Carson -GRC Consuling
Type & Sequence
SI1
Email Name
RAR
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Cost Summary <br /> Site: Deer Trail Pit Permit Action: 2023 Inspection Permit/Job#: M1988090 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 1/18/2024 County: Arapahoe Filename: 000 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Re-grade hi hwall to 31-1:1V DOZER 1 3.14 $1,470 <br /> 002 Backfill pit wall along road to 31-1:1V DOZER 2 9.96 $9,330 <br /> 003 Import topsoil SITEMAINT 1 0.00 $177,470 <br /> ENANCE <br /> 004 Site reve etation REVEGE 1 6.00 $33,826 <br /> 005 Mobilization and demobilization MOBILIZE 1 1.50 $3,034 <br /> 006 Spread 17,747 cubic yards of tops il DOZER 2 13.46 $12,610 <br /> L- SUBTOTALS: 34.06 $237,740 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $4,802 <br /> Performance bond: 1.05 Total= $2,496 <br /> Job superintendent: 16.00 Total= $1,041 <br /> Profit: 10.00 Total= $23,774 <br /> TOTAL O&P= $32,114 <br /> CONTRACT AMOUNT(direct+O&P)= $269,854 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $0 Total= $0 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $11,469 <br /> Reclamation management and/or administration: 5.00 $13,493 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $57,075 <br /> TOTAL BOND AMOUNT(direct+indirect)= $294,815 <br />
The URL can be used to link to this page
Your browser does not support the video tag.