My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-01-22_PERMIT FILE - C1980007A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2024-01-22_PERMIT FILE - C1980007A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2024 9:57:50 AM
Creation date
2/15/2024 8:50:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
1/22/2024
Doc Name
2.05-1 Thru 2.05-14
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mine <br /> <br />2.05-11 Rev. 11/04- PR11; 03/06- PR10; 07/15- MR413; 07/18- PR15, 01/24-TR152 <br />of combustible materials. West Elk Mine’s program is approved by the District Office of the <br />Mine Safety and Health Administration (MSHA). <br /> <br />Ventilation <br /> <br />Ventilation in the working sections where coal is being cut, and at the last open crosscut, has <br />been established to assure compliance with current Federal and State regulations. Abundant <br />fresh air is provided to the working face to dilute mine gases and diesel emissions to acceptable <br />levels. Stoppings are constructed of non-combustible material and built as airtight as possible to <br />assure that the maximum amount of clean air reaches the working face. Mine Ventilation <br />Boreholes (“MVB”, a.k.a. “MDW”) are also drilled from the surface to about 25 feet above the <br />top of the coal seam to be longwall mined. After the longwall face undermines the coal below <br />the MVB, a methane-driven mobile pump is started to supplement the ventilation system by <br />exhausting the methane from the caved gob area out of the mine rather than allowing it to enter <br />the main mine ventilation courses. <br /> <br />For the protection of the employees, the air courses are examined in accordance with State and <br />Federal standards or more often, if necessary, to protect the quality and quantity of air <br />underground. Methane above the permissible limits is either diluted and rendered harmless in <br />active areas of the mine through mine ventilation or drained-off prior to and during active mining <br />through the MVB systems. <br /> <br />Electrical Power <br /> <br />All electrical equipment at the mine meets applicable Federal regulations. In addition, regular, <br />documented inspections of the equipment are conducted. Equipment is adequately grounded to <br />prevent electrical shock hazards. Fences, metal buildings, and metal structures are also properly <br />grounded to prevent electrical shock hazards. Communication wires and exposed power <br />conductors entering the underground mine have lightning arresters and are hung or adequately <br />protected against mechanical damage. <br />Employees trained to perform electrical work are certified for that type of work by the <br />appropriate State and Federal agencies. Except for troubleshooting, work is not performed on <br />energized electrical equipment. Thus, high voltage lines, both on the surface and underground, <br />are de-energized and grounded before most work is performed. <br /> <br />Accidents <br /> <br />MCC reports to the applicable State and Federal agencies all serious accidents damaging the <br />mine, the lands, or other resources that could cause air or water pollution. The agencies are <br />notified by telephone or in writing. At the same time, MCC identifies any corrective actions <br />initiated to resolve the situation.
The URL can be used to link to this page
Your browser does not support the video tag.