My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-13_REPORT - C1980007
DRMS
>
Day Forward
>
Report
>
Coal
>
C1980007
>
2024-02-13_REPORT - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 8:38:13 AM
Creation date
2/14/2024 8:35:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
2/13/2024
Doc Name
Annual Reclamation Report
From
Mountain Coal Company
To
DRMS
Annual Report Year
2023
Email Name
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Reclamation, Mining and Safety <br /> Annual Reclamation Report for Calendar Year- 2023 <br /> West Elk Mine C-1980-007 Mountain Coal Company,LLC <br /> Mine Name Permit Number Permittee <br /> 5174 Highway 133,Somerset,CO 81434 <br /> Address <br /> This report,required by Rule 2.04.13,is due by February 15 of each year,or other date,as agreed upon by the Division. It should include text, <br /> discussion,and maps,at a minimum,in addition to any other reclamation monitoring data as required by the approved permit. The location of the <br /> acreage reported under each land status category and year of seeding(if applicable)should be clearly identified on a map included with the report. <br /> Last Year's Cumulative Total This Calendar Year <br /> Land Category (from s ARR Cumulative Total <br /> (f last year's � Acres Added(+) Acres Subtracted(-) <br /> Acreage in Active NA NA NA = NA <br /> Mining Areas' <br /> Last Year's Cumulative Total This Calendar Year <br /> Land Category (from s ARR Cumulative Total <br /> (f last year's � Acres Added(+) Acres Subtracted(-) <br /> Acres Disturbed2 544.66 0.00 0.00 = 544.66 <br /> Acres Backfilled and 162.25 2.6 0.00 = 164.85 <br /> Graded <br /> Acres Topsoiled 162.25 2.6 0.00 = 164.85 <br /> Acreage in Long-term Last Year's Cumulative This Calendar Year <br /> Facilities' Total Cumulative Total <br /> (from last year's ARR) Acres Added(+) Acres Subtracted(-) <br /> Non-Permanent 380.74 0.00 2.6 = 378.14 <br /> Facilities <br /> Permanent Facilities 0.00 0.00 0.00 = 0.00 <br /> (permitted) <br /> Totals 380.74 = 378.14 <br /> Acres Seeded Last Year's Cumulative Total This Calendar Year <br /> (permanent) (from s ARR Cumulative Total <br /> � ) (f last year's ) Acres Added(+) Acres Subtracted(-) <br /> 9 Years and Less 89.464 2.6 17.33 = 74.73 <br /> 10 Years and Greater 35.485 17.33 0.00 = 52.81 <br /> Totals 160.34 = 160.54 <br /> Last Year's Cumulative Total This Calendar Year <br /> Bond Release (from s ARR Cumulative Total <br /> (f last year's ) Acres Added(+) Acres Subtracted(-) <br /> Phase I Released 167.556 0.00 0.00 = 167.55 <br /> Phase II Released 117.647 0.00 0.00 = 117.64 <br /> Phase III Released 61.55' 0.00 0.00 = 61.55 <br /> 'Includes pits,topsoil stripped areas in advance of pits,and spoil not backfilled and graded <br /> 2Surface Mine Acres Disturbed=B&G+Long-Term Facilities+Active Mining Areas;Underground Mine Acres Disturbed=B&G+Long- <br /> Term Facilities;Separately-permitted Loadouts=B&G+Long-Term Facilities <br /> 'Includes haul,access and light-use roads,temporary dams and impoundments;permanent dams and impoundments;diversion and collector ditches, <br /> water and air monitoring sites;topsoil and overburden stockpiles;repair,storage and construction areas;office area,repair shops,and parking;coal <br /> stockpiles,loading,and processing areas;railroads;coal conveyors;refuse piles and coal mine waste impoundments;head-of-hollow fills;valley <br /> fills;ventilation shafts and entryways;and non-coal waste disposal area(garbage dumps and coal combustion by-products disposal areas). <br /> 'Corrected from 98.84 acres.Decrease is due to several years that should have been moved to>10 years category. <br /> 'Corrected from 61.8 acres.Decrease is due to a 1.63 acre mistake in 2017,incorrect addition of 15.25 acre SL-I I bond release in 2020 that should <br /> have been subtracted,and 5.11 acres not moved from>9 years in 2021. <br /> 6Corrected from 156.07 acres.Increase is due to missed Phase 1 Bond Release of 11.67 acres on 9/6/2022. <br /> Corrected from 125.29 acres. Decrease is due to incorrect addition of 7.65 acres in 2022. <br /> 'Corrected from 70.8 acres.Decrease is due to removing 9.25 acres that have not yet been bond released approved yet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.