Laserfiche WebLink
E. Other Disturbances (please describe) <br /> Disturbance beyond the drill access trails and pads is not expected. Access via a trail vs. <br /> a road is differentiated by the use of a bulldozer or grader that would be needed to cut a <br /> road into the ground surface. Access to collar locations will rely on existing drill trails that <br /> traverse the native terrain minimizing impact. <br /> F. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to <br /> store. <br /> Bentonite and cement, used to abandon holes, will be stored on site. Diesel fuel will be <br /> transported in the tanks on the pickups used by the drill crews and will be transferred to <br /> the rig each day. Drill fluids and lubricants will be stored on site in leak-proof containers. <br /> Petroleum products (gasoline, lubricants, etc.)will be stored on site in leak-proof, fuel <br /> containment tubs. <br /> G. New Roads: <br /> Length (ft): 2082 Width (ft): 12 <br /> Significantly <br /> Upgraded Roads Length (ft): 3217 Width (ft): 8 <br /> Are culverts or other crossings proposed? If so,please describe: <br /> No. <br /> H. Total project area to be disturbed(acres) 4.54 acres <br /> I. Describe the equipment to be used for the prospecting operations: <br /> Surface air/mud rotary drill rig, air compressor, water truck, pipe truck, backhoe, grader, <br /> buil dozer, seed drill, pick-up trucks, light plants as needed, small generator, mobe truck. <br /> A survey truck will be used to probe the holes with a gamma tool after drilling and before <br /> hole abandonment. <br /> Form 2—Public File Page 7 of 14 <br />