Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> 0-- 0:\*CLCSniCS_C:\ <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> 1) 6- <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> .5_Ji 0- CCL___ QC.1 r-p2 r 4IA11' <br /> Form 2—Public File Page 9 of 14 <br />