Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles,drill pads and collar areas of underground workings,ponds, etc. <br /> . ek_C ‘TO,A:\ <br /> tiQ (x. E)oht C <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes, diameter,depth,location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity jam( ,p Width (ft) N'pt Length (ft) ki i�} <br /> B. Drill Holes: <br /> Diameter <br /> Quantity �j �} Depth (ft) NM- (in) lk 111- <br /> C. <br /> Mud Pits <br /> Average Average Average <br /> Quantity AV/Pr Width (ft) NIA Length (ft) Ai/r1 Depth (ft) 41— <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance,describe type, quantity and general dimensions: <br /> �� Th <br /> Form 2—Public File Page 6 of 14 <br />