My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-06_PERMIT FILE - P2024003
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2024003
>
2024-02-06_PERMIT FILE - P2024003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 9:20:32 AM
Creation date
2/8/2024 9:18:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2024003
IBM Index Class Name
Permit File
Doc Date
2/6/2024
Doc Name
Notice Of Intent
From
Casey Evans
To
DRMS
Email Name
ERR
MAC
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Bar Star iviining <br /> Elliott.Russell@state.co.us <br /> DNR/DMRS <br /> 1313 Sherman St. room 215 <br /> Denver,Co 80203 <br /> Bar Star Land <br /> James Ingalls <br /> 303-408-3600 <br /> Form 2 (Public File) <br /> NOTICE OF INTENT TO CONDUCT PROSPECTIONS FOR HARD ROCK/METAL MINES <br /> Ill. Project Description <br /> Please see Exhibit B, C, D <br /> 5. A 5 acres total disturbance area will be mined for the life of this 'N101'. A 1-acre cut will <br /> be open at a time,to minimize adverse effects upon wildlife.Two acers total disturbance <br /> at a time, 1 acer will be mined with remaining acerl for the wash plant, stock pile of <br /> topsoil, overburdened and tailings. Each 1 acer cut will be_208.71 feet wide, 208.71 <br /> length, 15 feet deep. The cut will be surrounded with a temporary fencing, if needed, <br /> that will be removed upon completion for cows/wildlife. each cut's reclamation,to <br /> minimize adverse effects upon wildlife.The top 12 in. of topsoil will be set aside. Each 1 <br /> acer will be reclaimed by putting the dirt back the way it came out with the topsoil on <br /> top,seeded and watered maintained before starting the next cut. 4,840 yards per cut <br /> will be dump trucked semi over to the close circuit wash plant to be processed then <br /> returned to the cut to be reclaimed.The wash plant is a closed-circuit processing system, <br /> all water will be reused/recycled through the wash plant and the ponds. A new 1/2 acer <br /> pond with 40 mill pvc pond liner. pond will be used as a settling pond . The ponds will be <br /> a closed-circuit system to not cause any unnecessary disturbance/degradation or any <br /> leaking pond water into any natural water source. All 2 track roads will be done on top <br /> surface only as needed to complete. SEE MAPS/ATTCHMENTS <br /> 6. N/A See Exhibit C, D <br /> D. 1 acre cut will be open at a time. All dirt/topsoil will be stock pilled on <br /> the same acre. pond will be 104 feet wide by 208.71 long by 8 feet deep. <br /> First acre will have pond installed after digging out sand/gravel. water <br /> level will be only 5 feet deep with 3 feet sand covering pond liner for <br />
The URL can be used to link to this page
Your browser does not support the video tag.