Laserfiche WebLink
Red Creek Quarry Baseline <br />Surface Water and Groundwater Sampling and Analysis Plan Section 2: Site Description <br /> <br /> <br />2-2 <br /> <br />2.4 Mine Plan <br />Holcim plans to expand the currently permitted mine to a 3- to 5-million metric ton per year operation <br />mining Fort Hays limestone and related formations. Mining operations at the RCQ property are <br />planned to include quarry operations starting in the northwest corner of the six-section site, <br />construct a crushing plant at the northwest corner, and convey the material via the more than 7-mile <br />corridor to connect the RCQ operation site to the Portland plant. <br /> <br />