My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-01-31_REVISION - M1977344 (35)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2024-01-31_REVISION - M1977344 (35)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 8:27:36 AM
Creation date
2/6/2024 8:42:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
1/31/2024
Doc Name Note
App 4.1 Blasting Plan
Doc Name
Adequacy Review - Preliminary
From
Holcim
To
DRMS
Type & Sequence
AM2
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Figure 3. Alternative blasting level criteria. (Source Modified from figure B-1. Bureau of Mines R18507) <br /> <br />5.2 Limits on airblast <br />Air overpressure shall not exceed the maximum limit of 136 decibel (0.124 Kpa) at the location of any <br />building or structures within one half mile of the blast area. <br /> <br />5.3 Methods used to control adverse effects of blasting <br /> <br />For the adverse control effects of blasting, we propose the recommendations from ISEE, International <br />Society of Explosives Engineers: <br /> <br />Flyrock Control Issues <br />Issue Comment <br />Explosive Column <br />Length <br />Column length should never been longer than design to such and extend that estimated maximum flyrock <br />projections can exceed ½ to 2/3 of the distance to sensitive receivers. <br />Explosives Loaded <br />density <br />Loaded density should not be significantly higher than design-through incorrect gassing of emulsion <br />product, errors in the size high density base charges, reduction in size of air decks, or the use of larger <br />diameter cartridge products than was proposed in the design (where an air deck is specified, but the hole <br />is full of water, then calculations of effective density should ignore the air/ware/deck) <br />Stemming columns Stemming columns must be continues, and bridging of the stemming columns must avoid - best achieved <br />through the use of uncontaminated, well-graded aggregate material, and loaded so as to avoid bridging <br />Protocols for <br />exception reporting <br />Errors will happen, and adjustments to procedures can be made providing that the error is reported and <br />tools are available to provide reliable estimates of worst-case outcomes. <br />Table 2. Flyrock control issues. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.