My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-01-31_REVISION - M1977344 (35)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2024-01-31_REVISION - M1977344 (35)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 8:27:36 AM
Creation date
2/6/2024 8:42:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
1/31/2024
Doc Name Note
App 4.1 Blasting Plan
Doc Name
Adequacy Review - Preliminary
From
Holcim
To
DRMS
Type & Sequence
AM2
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
minimize ground vibration at future RCQ facilities (offices, quarry shop, secondary crusher, convey <br />system), track rock mass properties, emplace near field and far field seismograph locations. Define <br />blasting criteria (PPV, Frequency ranges) for production blast, trim blast, and modified production blast. <br />To identify better technique for production and critical areas such as close to Red Creek Canyon. <br />As reference, the following is an explanation of both techniques. Blast size, number of holes per row, <br />blast design, burden – spacing, blast fragmentation will be refine during the Developing stage. <br />- Trim blasting, Compare with a production blast are smaller in number of holes and tonnage, the <br />fully relieved face allows material to move away, and prevent blast energy from damaging the <br />final wall. Graph show blast patterns, production blast with a free face perpendicular to Red <br />Creek Canyon, after it is blast and clean expose a free face for trim blast to minimize vibrations <br />directed into the wall. <br /> <br /> <br /> <br />Section, showing final slope design and Red <br />Creek. Crest final quarry wall to berm 100ft <br /> <br />- Modified production blast pattern. It could combines pre splitting, air decking, reduced charge <br />weights near the final quarry wall by thirty to sixty percent, holes in colors close to the wall <br />could be loaded with less explosives. Thus, this blast pattern reduces the overall energy of the <br />blast and minimize impacts over the final quarry wall.
The URL can be used to link to this page
Your browser does not support the video tag.