My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-01-31_REVISION - M1977344 (21)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2024-01-31_REVISION - M1977344 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 8:25:01 AM
Creation date
2/6/2024 8:39:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
1/31/2024
Doc Name Note
2.7 Exhibit G - Water Information
Doc Name
Adequacy Review - Preliminary
From
Holcim
To
DRMS
Type & Sequence
AM2
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Portland Limestone Quarries (M-1977-344) Permit Amendment-02 <br />Holcim US Inc, 3500 Highway 120, Florence, CO 81226 Revised pursuant to preliminary adequacy review November 20, 2023 <br />Phone (719) 288-1443 www.holcim.us 93 <br />Hayes Limestone and Codell sandstone) and are in close proximity to each other in order to monitor the <br />hydrologic conditions in both formations. The monitoring well permits are provided in Appendix 4.3. <br /> <br />Figure 2.7.3-1: Groundwater Well Location Map <br />A stilling well was installed along the north side of Red Creek to measure water levels within the saturated <br />alluvium of the creek bed as a proxy measurement of the creek water elevation (Figure 2.7.3-1). The <br />stilling well was drilled using an auger to advance a hole to approximately five feet below ground surface. <br />A five-foot polyvinylchloride (PVC) slotted screen with an end capped was placed into the hole then sand <br />was backfilled in the wellbore up to the surface. <br />Transducers were installed after development operations in Well 1, Well 2N, Well 2S, Well 3, Well 4, and <br />the Stilling Well to continuously monitor the groundwater levels. Immediately prior to transducer <br />installation, a depth-to water measurement was collected to establish a value between transducer <br />measurement and elevation. Coordinate and elevation data were collected by Holcim for each well casing <br />and adjacent ground surface using survey equipment. <br />A surface water flow monitoring station consisting of a ramp flume designed to measure flow between 0.1 <br />to 3.5 cubic feet per second (cfs) was installed in August 2022. The location of the flume was selected <br />based on a visual reconnaissance of the stream and the proximity to the surface water seeps . <br />The Sampling and Analysis Plan (SAP) was implemented during the baseline monitoring and sampling <br />activities. This SAP is designed to collect data to assess potential water resource impacts from mining
The URL can be used to link to this page
Your browser does not support the video tag.