My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-01-31_REVISION - M1977344 (18)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2024-01-31_REVISION - M1977344 (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 8:24:25 AM
Creation date
2/6/2024 8:37:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
1/31/2024
Doc Name Note
2.4 Exhibit D - Mining Plan
Doc Name
Adequacy Review - Preliminary
From
Holcim
To
DRMS
Type & Sequence
AM2
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Portland Limestone Quarries (M-1977-344) Permit Amendment-02 <br />Holcim US Inc, 3500 Highway 120, Florence, CO 81226 Revised pursuant to preliminary adequacy review November 20, 2023 <br />Phone (719) 288-1443 www.holcim.us 72 <br /> <br />Figure 2.4.3-1 Mine Plan Blocks <br />2.4.4 Mine Infrastructure Development <br />The mine will develop as two distinct development projects. MTAC from the plant to RCQ and the Hwy 96 <br />Access to RCQ will be developed first. Once safe access is available for contractors, vendors and <br />employees, development of the mine infrastructure will begin including fencing and RCQ mine buildings <br />and utilities. <br />2.4.4.1 Material Transport and Access Corridor <br />MTAC will include an access road for employees and vendors and the planned overland conveyor system <br />(Figures 2.4.4.1-1 thru 3). The corridor will extend from the plant to RCQ or approximately 6.7 miles. The <br />conveyor and a maintenance road will lie inside a chain link fence. The access road will lie west of the <br />conveyor fence. <br />The gravel access road will be 40 foot wide to allow safe passage of both employees and equipment in <br />both directions. The road will be constructed with road base as the sub grade and 8 inches of gravel. The <br />road will have 10-foot-wide graded shoulders. <br />The conveyor will be constructed as the road is being constructed. The conveyor will be an overland <br />system with 13 elevated wildlife crossings. The wildlife crossings will be constructed over shallow natural <br />ravines or dry stream beds. The elevated section will span approximately 95 feet, reaching an elevated <br />height of 10 feet 9 inches, allowing the safe passage of wildlife along MTAC. The conveyor will be <br />supported by steel supports on precast concrete pads set on the graded and leveled ground surface ever y <br />9 feet.
The URL can be used to link to this page
Your browser does not support the video tag.