My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-01-31_REVISION - M1977344 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2024-01-31_REVISION - M1977344 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 8:22:04 AM
Creation date
2/6/2024 8:36:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
1/31/2024
Doc Name Note
2.12 Exhibit L - Reclamation Cost Estimate
Doc Name
Adequacy Review - Preliminary
From
Holcim
To
DRMS
Type & Sequence
AM2
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task Description:Backfill 2 bench highwalls 3H:1V Task #007 <br />Site:Red Creek Quarry <br />HOURLY EQUIPMENT COST <br />Basic Machine:C730 Truck CAT 950 Loader CatD8 Dozer 2500 gallon water truck <br />Unit Cost/Hour:129.72$ 95.37$ 191.83$ 57.56$ <br />Unit Production:18.06 LCY <br />90.30 LCY/Hr 528.59 LCY/Hr <br />MATERIAL QUANTITIES <br />Initial volume:6,651,983 LCY <br />Swell factor:1.125 <br />Loose volume:7,483,481 LCY <br />TRAVEL TIME <br />Haul distance 1000 ft <br />Total cycle time 12 minutes <br />JOB TIME AND COST <br />Fleet size:4 truck, 2 loader, 2 dozer, 1 water truck <br />Total job time:7,078.72 <br />Fleet cost /hour 1,150.84 <br />Total job cost:8,146,473.76$
The URL can be used to link to this page
Your browser does not support the video tag.