Laserfiche WebLink
Task Description:Rip BCQ Plant, Arkansas River Crossing Area and interior roads Task #003 <br />Site:Bear Creek Quarry <br />HOURLY EQUIPMENT COST <br />Basic Machine:Cat D8 with 3-shank ripper <br />Horsepower:310 <br />Unit Cost/Hour:208.90$ <br />MATERIAL QUANTITIES <br />Area:162 acres <br />Rip depth 1 feet <br />Volume:29,000 CY <br />Unit production:0.75 acre/hr <br />JOB TIME AND COST <br />Fleet size:1 dozer <br />Unit cost:278.53$ <br />Total job time:216.00 <br />Total job cost:45,122.40$