Laserfiche WebLink
According to searches on the Division of Water Resources (DWR) database, there are no known <br /> wells permitted within 600 feet of the Siskin Pit permit boundary. <br /> 6.4.7(3) <br /> Dust will be controlled by water on a day-to-day basis, though additional dust mitigation on <br /> roadways includes bi-annual or as needed applications of magnesium chloride. Water will be <br /> used as needed to eliminate any problem dust areas and to be used in a spray bar during initial <br /> crushing. <br /> 6.4.7(4) <br /> The legal source of water for consumed purposes (e.g., dust control) will be fully consumable <br /> water rights leased to the operation. <br /> The site will not affect existing water rights. The quarry will not expose groundwater and will <br /> not store stormwater for more than 72 hours. After reclamation, stormwater encountered in the <br /> mining area will continue to infiltrate or evaporate. <br /> 6.4.7(5) <br /> The operator will apply for and receive a CDPHE discharge permit. <br /> Siskin Pit <br /> UlioNicki Junuu1•l.2024 G-5 <br /> 8.; 1.,ti.uiate, <br />