Laserfiche WebLink
Table 4: Example Native Dry Rangeland Seed Mix <br /> Scientific Name Common Name ! %of Mix LBS/PLS Required <br /> Achiliea millefolium Western yarrow 5 0.1 <br /> Achnatherum hymenoides Indian ricegrass 5 2.0 <br /> Bouteloua gracilis Blue grama 10 0.9 <br /> Bromus marginatus Mountain brome 5 5.1 <br /> Elymus elymoides Bottlebrush squirreltail 10 3.4 <br /> Elymus lanceolatus Thickspike wheatgrass 10 4.2 <br /> Eragrostis trichodes Sand lovegrass 5 0.2 <br /> Koeleria macrantha Prairie junegrass 5 0.1 <br /> Linum lewisii Blue flax 5 1.9 <br /> Nassella viridula Green needlegrass 5 1.9 <br /> Pascopyrum smithii Western wheatgrass 10 5.7 <br /> Poa secunda Sandberg bluegrass 5 0.3 <br /> Pseudoroegneria spicata Bluebunch wheatgrass 10 5.2 <br /> Schizachyrium scoparium Little bluestem 5 1.4 _ <br /> Sorghastrum nutans Yellow Indiangrass 5 1.9 <br /> Total: 100 34.3 <br /> Notes: <br /> Quantity assumes 150 seeds per square foot broadcast seeded. Reduce by 25%for drill seeding. <br /> Quantity based on 1.0 acres of seeding(adjust according to required acreage). <br /> Final species composition and rates subject to availability. <br /> 6.4.5(2)(e) <br /> Reclamation will be performed concurrently with mining to minimize liability and to keep the <br /> financial warranty lower. Slopes will be regraded, backfilled, and topsoil applied as soon as they <br /> are able to be reclaimed and as additional mining phases become active. Seeding will take place <br /> during the spring or fall following topsoil application. See Table 1 for a description of size and <br /> timing of each phase. <br /> An additional estimated 6 months of final reclamation construction will be required after mining <br /> is completed. For example, Phase 1 is estimated to take 16 years in active mining, in which case <br /> phase I may be fully reclaimed (subject to time for establishment of vegetation) within 17 years <br /> of the operation's first date of activity. Mining is ongoing at the site as of the date of submittal <br /> and will be completed by 2086 if all four phases are mined completely. Therefore, final <br /> Siskin Pit <br /> gi Associates. January 2024 E-3 <br />