My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-01_REVISION - M1987116
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987116
>
2024-02-01_REVISION - M1987116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2024 9:58:57 AM
Creation date
2/5/2024 10:57:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987116
IBM Index Class Name
Revision
Doc Date
2/1/2024
Doc Name
Request For Conversion
From
Lewicki & Associates
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to size and sorted into piles accordingly. Sorted and stockpiled final saleable material will be <br /> hauled off site. There is no secondary product to be mined at this site. <br /> 6.4.4(h) <br /> No incidental products will be produced at this mine. In the event that incidental commodities <br /> become available, a Technical Revision will be filed with the Division prior to the sale of said <br /> incidental products. <br /> 6.4.4(i) <br /> Explosives will be used in same way they are used currently. See the blast plan is included in <br /> Appendix 2—Blast Plan. Blasting will continue to be completed in-house by the operator. <br /> 6.4.4(j) <br /> The site will use existing on-site roads, where possible and until they are mined, and will create <br /> new onsite roads as mining progresses throughout the site. Current onsite roads are shown on <br /> Maps C-1 and C-2, roads created during mining are shown on Map C-3 and final reclamation <br /> roads are shown on Map F-1. Haul traffic will exit the site and travel towards Highway 96. Road <br /> CR 344 runs directly to the current mine and will be slightly rerouted to remain outside the <br /> mining extents of phases 1 and 2 of the mine. An access road will also be constructed extending <br /> from CR 344 for access to the north pit of the mine. <br /> Newly constructed roads feature an uphill parallel ditch that diverts stormwater from running <br /> across the road. All diverted stormwater will be discharged in accordance with the site's CDPHE <br /> discharge permit. Map C-3 and the included inset cross section detail how drainage crossings <br /> will be constructed. <br /> Siskin Pit <br /> January 2024 D-8 <br /> © Lcµicki i;t Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.