Laserfiche WebLink
TR3 Adequacy Review 1 <br /> Nissan Farm Resource(Permit M2003-001) <br /> Page 3 of 3 <br /> the areas/acreages where these mixes will be used. You will also need to <br /> specify the numbers and size (1 gallon, 3 gallon etc.) of trees/shrubs of each <br /> type per acre to be planted and show approximate tree shrub planting areas on <br /> the reclamation plan map. Please note that planting trees/shrubs too close to a <br /> lined reservoir may jeopardize the integrity of the liner if it is impacted by <br /> root growth. <br /> f. What is the feature on the east side of both maps outlined with the "%" <br /> symbol? Please add this to the legend or remove from the maps as <br /> appropriate. <br /> 4) Updates to Proposed Reclamation Bond Calculation: DRMS will review the bond <br /> calculations as needed when the remaining adequacy issues are resolved. Please note <br /> that an accurate bond calculation will require the determination of how much excess <br /> stockpile material (if any) will need to be removed from the site to preserve pre- <br /> mining elevations as outlined in item 2b, as well as accurate responses to items 3d <br /> and 3e listed above. <br /> This letter shall not be construed to mean that there are no other technical issues in the <br /> submittal. Other issues may arise during the review process, or as additional information is <br /> supplied. <br /> If you have any questions, please contact me at(303) 229-9414. <br /> Sincerely, <br /> ��V- Javl— <br /> Eric Scott <br /> Environmental Protection Specialist <br />