Laserfiche WebLink
Ninth Technical Revision (TR09) to Permit M-1973-021, Holcim- WCR, Inc. Morrison Quarry <br /> <br /> <br /> <br />January 2024 | 14 <br />4 Exhibit F – Reclamation Plan Map <br />Exhibit F-1 includes the West and South Quarry reclamation plan map. Exhibits F-1a – F-3a present <br />cross sections. These maps reflect the reclamation approved in AM07 with the exception of the <br />bottom floor elevation being at El. 6,600 based on groundwater elevations in the pit. All final <br />reclamation elements to be completed at this elevation (i.e. grading, drainage, revegetation) remain <br />unchanged from AM07, with the exception of the final grading of the South Quarry floor (El. 6,600) at <br />a 3% slope (southwest or northeast) to convey stormwater to Outfall 003 and the main quarry <br />access road.