Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br /> Annual Reclamation Report for Calendar Year — 2023 <br /> Deserado Mine C-1981-018 p Blue Mountain Energy, Inc. p <br /> Mine Name Permit Number Permittee <br /> 3607 County Road 65 Rangely, CO 81648 <br /> Address <br /> This report,required by Rule 2 04 13,is due by February 15 of each year,or other date,as agreed upon by the Division it should include text, <br /> discussion,and maps,at a minimum,in addition to any other reclamation monitoring data as required by the approved permit The location of the <br /> acreage reported under each land status category and year of seeding(if applicable)should be clearly identified on a map included with the report <br /> Last Year's Cumulative Total This Calendar Year <br /> Land CategoryCumulative Total <br /> (from last year's ARR) Acres Added(+) Acres Subtracted(-) <br /> Acreage <br /> in Active <br /> Mining Areas' N/A N/A N/A = N/A <br /> Last Year's Cumulative Total This Calendar Year <br /> Land CategoryCumulative Total <br /> (from last year's ARR) Acres Added(+) Acres Subtracted(-) <br /> Acres Disturbed' 639.4581 2.90 0 = 642.3581 <br /> Acres Backfilled and <br /> Graded 177.62 3.00 0 = 180.62 <br /> Acres Topsoiled 177.62 3.00 0 = 180.62 <br /> Acreage in Long-term Last Year's Cumulative This Calendar Year <br /> Facilities' Total Cumulative Total <br /> (from last year's ARR) Acres Added(+) Acres Subtracted(-) <br /> Non-Permanent <br /> Facilities461 .8381 2.90 3.00 = 461.7381 <br /> Permanent Facilities 0 0 0 0 <br /> (permitted) <br /> Totals 461.8381 = 461.7381 <br /> Acres Seeded Last Year's Cumulative Total This Calendar Year <br /> (permanent) year's ARR) Cumulative Total <br /> (P ) (from last Acres Added(+) Acres Subtracted(-) <br /> 9 Years and Less 32,99 3.00 0 = 35.99 <br /> 10 Years and Greater 144.63 0 0 = 144.63 <br /> Totals 177.62 = 180.62 <br /> Last Year's Cumulative Total This Calendar Year <br /> Bond Release (from last year's ARR) Cumulative Total <br /> Acres Added(+) Acres Subtracted(-) <br /> Phase I Released 0 0 0 = 0 <br /> Phase II Released 0 0 0 = 0 <br /> Phase III Released 0 0 0 = 0 <br /> 'Includes pits,topsoil stripped areas in advance of pits,and spoil not backfilled and graded <br /> 'Surface Mine Acres Disturbed=B&G+Long-Term Facilities+Active Mining Areas,Underground Mine Acres Disturbed=B&G+Long- <br /> Term Facilities,Separately-permitted Loadouts=B&G+Long-Term Facilities <br /> 'Includes haul,access and light-use roads,temporary dams and impoundments,permanent dams and impoundments,diversion and collector ditches, <br /> water and air monitoring sites,topsoil stockpiles,overburden stockpiles,repair, storage and construction areas, office area,repair shops, and <br /> parking,coal stockpiles,loading,and processing areas,railroads,coal conveyors,refuse piles and coal mine waste impoundments,head-of-hollow <br /> fills,valley fills,ventilation shafts and entryways,and non-coal waste disposal area(garbage dumps and coal combustion by-products disposal <br /> areas) <br /> February 8,2019 <br />