Laserfiche WebLink
inch pipe shall be located between Z-6"and Y-0"above the top of <br /> the final ground surface. <br /> ifi. The design documents submitted to Owner shall include, at a minimum, <br /> the following: <br /> a) Design drawings that include a plan and profile drawing that shows <br /> the horizontal and vertical alignment of the pipe, inletsloutlets, and other <br /> components of the interconnect; limits of excavation and backfill types <br /> along the pipe and around the structures; plan and section drawings that <br /> depict structural details, thickness of reinforced concrete, and types and <br /> locations of reinforcing steel, connection details for gates and other <br /> embedded items, and any other facilities that are part of the interconnect, <br /> sections and details that depict the connection between the pipe and the <br /> liner, and sections and details that depict all pipe connections and <br /> cathodic protection system components. <br /> b) Hydraulic calculations that were used to size the pipe, trashracks, <br /> and gates, geotechnical calculations for lateral earth pressures, bearing <br /> capacity, consolidation/swell, and structural calculations for structural <br /> stability and design of the reinforced concrete, structural members, and <br /> trashracks. <br /> c) Technical specifications for interconnect construction. These shall <br /> include requirements for dewatefing and management of groundwater, <br /> excavation, foundation preparation, side slopes for excavation and fill <br /> placement against native materials and previously placed fill material, and <br /> for connection to the liner, description of all materials for pipe, concrete, <br /> steel, gates, and other materials that will be used to construct the <br /> interconnect, sequencing requirements and procedures that will be <br /> required to construct the various parts of the interconnect, requirements <br /> for commissioning and testing the interconnect, protection for completed <br /> -portions of work, and required quality control testing for earthwork, pipe, <br /> and concrete and frequency of observation by the design engineer. <br /> E. Exceptions <br /> Notwithstanding anything to the contrary above, in the event that design or <br /> installation activities have begun prior to the execution of this Construction <br /> Agreement, any requirement for the notification of an event or planned activity by <br /> Contractor to Owner or the delivery of any document or plans by Contractor to <br /> Owner, shall be modified to require such notification or delivery prior to the <br /> execution of this Construction Agreement <br /> F. Approval of Reservoir or Cell by SEO <br /> Construction Agreement—Zadel(v.4-24-08) <br /> 14 <br />