My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-01-25_REVISION - M2003001
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003001
>
2024-01-25_REVISION - M2003001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2024 9:42:15 AM
Creation date
1/25/2024 9:17:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003001
IBM Index Class Name
Revision
Doc Date
1/25/2024
Doc Name
Request for Technical Revision
From
BURNCO Colorado LLC
To
DRMS
Type & Sequence
TR3
Email Name
ECS
MAC
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
* COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> * 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> /a76 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET TR-3 <br /> File No.: M- 2003-001 Site Name: Nissen Farm Resource ECS/MAC <br /> County Weld TR# (DRMS Use only) <br /> Permittee: BURNCO Colorado LLC ,,.iD <br /> REiIE <br /> Operator(If Other than Permittee): <br /> Devon Glosser SAN 2 5 2,0Z4q24 <br /> Permittee Representative.. gnatAIL <br /> ColoradMiningG f <br /> Please provide a brief description of the proposed revision: <br /> Update mine plan map. Update reclamation plan map. Update reclamation bond cost <br /> estimate. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.