My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-01-10_GENERAL DOCUMENTS - C1980007 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2024-01-10_GENERAL DOCUMENTS - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2024 11:14:08 AM
Creation date
1/23/2024 11:13:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
1/10/2024
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Mountain Coal Company, LLC & BLM & OSM & USDA
Type & Sequence
SL16
Permit Index Doc Type
Findings
Email Name
LDS
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In the site-wide reclamation cost estimate (RCE)recently completed with the approval of Permit <br /> Renewal 08 (RN-08)the reclamation of sites included in the SL-16 application is accounted for in task <br /> 419c, which also includes some sites that are not addressed with SL-16; this task will need to be <br /> reconciled when the next site-wide RCE is calculated. The pro-rated total of the estimated direct cost <br /> associated with task 419c(Y)is $23,184.77, as shown in table 4. <br /> Table 4 <br /> RN7 Cost Estimate Task Number Task Description Task Direct <br /> Cost <br /> 419c 35 MVBs/Exp in SL-12:topsoil $36,355.00 <br /> Task 419c pro-rated for 14.36 of 22.58 acres $23,120.36 <br /> Total applicable to SL-16 $23,120.36 <br /> In order to (i) comply with Rule 3.03.1(2) and (ii) ensure that the revised required surety is <br /> sufficient to cover the remaining reclamation liability at the mine,the Division will release <br /> whichever is the smaller of the two values X and Y. In this case,the smaller value,Y, is <br /> $23,120.36. <br /> The Division currently holds a performance bond of$15,000,000. Based on the observations above, the <br /> Division proposes to release $23,120.36. Following the approval of SL-16 the revised required surety <br /> will be $11,282,866.43 which is sufficient to assure completion of the remaining reclamation work at the <br /> site if the work had to be performed by the Division, including the cost of reestablishing vegetation on <br /> any revegetated areas, should those areas fail. The Division estimates its cost to complete remaining <br /> reclamation work at the site to be $11,282,866.43. <br /> Table 5 <br /> West Elk Mine(C-1980-007)Bond Release Summary <br /> Acres Amount Required Surety Estimated Reclamation <br /> Liability <br /> Prior to SL-16 556.62 $11,305,986.79 $11,305,986.79 <br /> Phase 1 0 $0.00 <br /> Released with SL-16 Phase 11 14.36 $23,120.36 <br /> Phase 111 0 $0.00 <br /> Following approval of SL-16 556.62 $11,282,866.43 $11,282,866.43 <br /> C-sL-10 <br /> C-1980-007 Page 10 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.