Laserfiche WebLink
-4- <br /> 12. Prima future(Post-mining)land use(check one): <br /> Cropland(CR) ID Pastureland(PL) General Agriculture(GA) <br /> DRangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> DResidential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> DDeveloped Water Resources(WR) i:i Solid Waste Disposal(WD) <br /> 13. Primar resent land use check one : <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Material will be extracted from the site use front end loaders and excavators. <br /> 15. On Site Processing: El Crushing/Screening <br /> 13.1 Brietly explain mining method(e.g.truck/shovel): <br /> Excavation wit be pedotmed by powered scrapers which will remove and haul the raw resource to a processing plant The scrapers wit deposit the material in a surge pile A front-end loader will deposit the <br /> material from the surge pile Into the cushing and screening plant. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> No designated chemicals or acid-producing materials will be used or stored within the permit area. <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> This amendment will add approximately 18.2 acres and update the current mining and <br /> reclamation plans to adhere to the Division's requirements. This amendment will also address <br /> February of 2023. <br />