Laserfiche WebLink
Chavers Mining Resource <br /> DRMS Permit No.M-2015-030 <br /> Amendment No.2(AM-02) <br /> January 2024 <br /> Page 12 <br /> (7)Reclamation of the Site to rangeland will utilize fertilizers and/or soils amendments, <br /> as needed. <br /> (8)Vegetative piles will be removed from the Site as part of final reclamation. <br /> 3.1.10 Revegetation I I6(4)(f): <br /> (1) All areas will be revegetated for long-lasting coverage that is capable of self- <br /> regeneration using native grasses and forbs. Additional details are provided in Section <br /> 6.4.5 (2)(d)Revegetation Plan. <br /> (2)Reclamation will not include forest planting. <br /> (3) Land will be restored to slopes commensurate for rangeland use and capable for <br /> livestock to traverse. <br /> (4) Revegetation will consist of native grasses and forbs to provide for the greatest <br /> probability of success. Grazing will not occur until revegetation has been established. <br /> (5)ASCI will employ appropriate techniques of site preparation to ensure a diverse and <br /> long-lasting vegetative cover(e.g.,discing, crimping,ripping, mowing,mulching, soil <br /> amendments, cover crops, and/or fertilizers). <br /> (6) ASCI will monitor progress of revegetation and implement weed control practices <br /> as appropriate for any areas infested by noxious weed species. <br /> (7) As necessary, temporary dirt access roads and/or fire lanes will be constructed <br /> through areas to be planted for planting crews, supervision, and inspection. <br /> (8)ASCI will implement final reclamation planting after all other uses of the property <br /> are complete. <br /> (9) If adverse characteristics of the surface, not feasibly remedied by artificial <br /> measures, would seriously inhibit plant growth, planting may be delayed depending <br /> upon natural corrective processes over a ten-year period. <br /> 3.1.11 Buildings and Structures 116(4)(r): No building or structures are anticipated to be left <br /> on-site or constructed as part of the reclamation plan. <br /> 3.1.12 Signs and Markers: <br /> (1) Throughout the reclamation process, ASCI will maintain a sign at the entrance to <br /> the facility and clearly visible from the road with the following information: 1)Name <br /> of Operator;2) Statement that a reclamation permit has been issued by the MLRB; and <br /> 3)Permit Number. <br /> (2) Throughout the reclamation process, ASCI will maintain monuments/markers <br /> clearly identifying the affected area boundaries <br /> (3)No alternative plan for identifying affected area boundaries is anticipated. <br />