My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-01-17_REVISION - M2015030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2015030
>
2024-01-17_REVISION - M2015030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2025 6:48:58 AM
Creation date
1/18/2024 8:41:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015030
IBM Index Class Name
Revision
Doc Date
1/17/2024
Doc Name
Adequacy Review Response
From
Asphalt Specialties CO
To
DRMS
Type & Sequence
AM2
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chavers Mining Resource <br /> DRMS Permit No.M-2015-030 <br /> Amendment No.2(AM-02) <br /> January 2024 <br /> Page 8 <br /> proceed with the revegetation process. The approximate final contours of the Site are <br /> shown on Exhibit F -Reclamation Plan Map. <br /> ■ Seeding and Growth Monitoring: The topsoil layer will be seeded with a native grass <br /> seed mix to return the property to rangeland use. Growth of the grass will be monitored <br /> quarterly until established to ensure a successful transition back to rangeland use. <br /> 6.4.5 (2)(b) Land Uses in the Vicinity <br /> Reclamation to rangeland land is a positive and useful post-closure land use that is compatible <br /> with surrounding uses which include multiple sand and gravel mines, oil and gas industry sites, <br /> and other rangeland/agricultural lands. <br /> 6.4.5 (2)(c) Reclamation Performance Standards <br /> The following sections describe how this reclamation plan meets applicable requirements of <br /> Construction Materials Rule No. 3, Section 3.1 Reclamation Performance Standards. <br /> RULE 3: Section 3.1 -Reclamation Performance Standards <br /> 3.1.1 Establish Post Mining Land Use: The post-mining land use shall return the property to <br /> rangeland use. The Site is currently zoned Agricultural by the City of Fort Lupton. <br /> 3.1.2 Reclaiming Substituted Land:Not Applicable <br /> 3.1.3 Time Limited and Phased Reclamation: A phased reclamation approach will be <br /> implemented. Reclamation will occur in two (2)phases: <br /> ■ Reclamation Phase 1: Backfill—Reclamation Phase 1 will backfill excavated <br /> with on-site overburden, crusher fines, wash plant fines, and imported clean, <br /> uncontaminated material. Backfill will occur concurrently with mining whenever <br /> possible; however,backfill will continue after mining is complete. Reclamation <br /> Phase 1 will be complete when backfill of the entire Site is within approximately 2 <br /> - 3 feet of final grade as indicated by ASCI survey. Should completion of <br /> Reclamation Phase 1 not be feasible within five(5)years from the date ASCI <br /> informs the DRMS that all material extraction and stockpile removal is complete, <br /> an extension will be submitted based on the remaining backfill volume required at <br /> that time. <br /> ■ Reclamation Phase 2: Grading,Topsoil, Seeding,and Growth Monitoring—In <br /> Reclamation Phase 2,ASCI will remove existing structures, grade Site contours <br /> for the±87 acres of affected area to approximately twelve (12) inches below the <br /> final grade, and place a minimum final cover topsoil layer twelve (12) inches thick <br /> across the affected area. Changes to topography will be made as necessary until the <br /> final grade is within acceptable limits and returned to pre-mining elevations. Once <br /> final grade is achieved, site seeding, fertilizing, and mulching will occur in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.