My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-01-10_GENERAL DOCUMENTS - C1981008
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981008
>
2024-01-10_GENERAL DOCUMENTS - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 7:27:03 AM
Creation date
1/10/2024 11:16:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
General Documents
Doc Date
1/10/2024
Doc Name Note
(Revised) Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Tony Tennyson -Colowyo
Type & Sequence
SL26
Permit Index Doc Type
Findings
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#057 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Regrade diversion/collection ditches <br /> Site: New Horizon Mine Permit Action: SL26 Permit/Job#: C1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 057 State: Colorado Abbreviation: None <br /> Date: 1/4/2024 County: Montrose Filename: C008-057 <br /> User: CCW <br /> Agency or organization name: Colorado Division of Reclamation,Mining and Safety <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D3K XL-3P <br /> Horsepower: 74 <br /> Blade Type: Power Angle Tilt <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $47.41 NA <br /> Operating Cost/Hour: $33.78 100 <br /> Ripper own. $3.15 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $2.24 100 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $127.88 <br /> Total Fleet Cost/Hour: $127.88 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 161 <br /> Swell factor: 1.165 <br /> Loose volume: 188 LCY <br /> Source of estimated volume: Length from map 2.05.3-1,from Sec 2.05.3,SL-21,SL- <br /> 23 <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly 169.6 LCY/hr <br /> production: <br /> Materials consistency description: Consolidated stockpile 1.0 <br /> Average push 0% <br /> gradient: <br /> Average site altitude: 5,700 feet <br /> Material weight: 2,900 lbs/LCY <br /> Weight description: Decomposed rock-50%Rock,50%Earth <br />
The URL can be used to link to this page
Your browser does not support the video tag.