Laserfiche WebLink
The Division estimates liability at the Loadout, prior to the approval of SL-03 to be $862,287.00. <br /> This amount was determined using the reclamation tasks from Midterm Review RN-6 completed in <br /> December of 2022 and updated with CIRCES costs evaluated by the Division in 2023. The current <br /> bond held with the Division for HGLO is $865,033.00. With SL-03, the Division proposes to release <br /> $826,596.00. <br /> The remaining $38,436.00 is sufficient to assure completion of the remaining reclamation work at the <br /> site if the work had to be performed by the Division, including the cost of reestablishing vegetation on <br /> any revegetated areas, should those areas fail. <br /> Reclamation work which remains to be done at the site includes revegetation of the 2.3 acres at the northern <br /> boundary of the permit. This area has been converted into irrigated hay fields and will be eligible for <br /> release after the 10-year liability period. The list of remaining reclamation tasks to be completed is <br /> provided in Table 1 at the end of this document. <br /> Permit Number C-1992-081 Page 7 of 7 <br />