Laserfiche WebLink
Mobilization Worksheet Cont'd Task 4 045 Page 3 of 3 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: HAYDEN <br /> Total one-way travel distance: 10.00 miles <br /> Average Travel Speed: 25.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $8 728 21 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $474.78 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.40 0.40 <br /> Return Time(Hours): 0.40 0.40 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 1.80 0.80 <br /> JOB TIME AND COST <br /> Total job time: 3.60 Hours <br /> Total job cost: $9,203 <br /> CIRCES Cost Estimating Software <br />