My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-01-04_GENERAL DOCUMENTS - C1992081
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1992081
>
2024-01-04_GENERAL DOCUMENTS - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 9:49:50 AM
Creation date
1/4/2024 9:49:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
General Documents
Doc Date
1/4/2024
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
SL3
Permit Index Doc Type
Findings
Email Name
HR1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#025 Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Replace Topsoil on Rail Spur <br /> Site: Hayden Gulch Loadout Permit Action: SL3 Permit/Job#: C1992081 <br /> PROJECT IDENTIFICATION <br /> Task#: 025 State: Colorado Abbreviation: None <br /> Date: 10/12/2023 County: Routt Filename: 025 <br /> 3:21:40 PM <br /> User: HR1 <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G w/push-pull <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA NA NA NA <br /> Ownership cost/hour: $255.23 NA NA NA NA NA <br /> Operating cost/hour: $280.59 NA NA NA NA NA <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA NA NA NA NA NA <br /> Ripper op.cost/hour: NA NA NA NA NA NA <br /> Operator cost/hour: $30.90 NA NA NA NA NA <br /> Unit Subtotals: $566.72 NA NA NA NA NA <br /> Number of Units: 2 0 0 0 0 0 <br /> Group Subtotals: Work: $1,133.44 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour: $1,133.44 <br /> MATERIAL QUANTITIES <br /> Initial volume: 700 CCY Swell factor: 1.125 <br /> Loose volume: 788 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,550 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Earth-Dry packed Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 32.00 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.