be exercised to avoid any effect to these structures and artifacts, in order to preserve their <br /> integrity. Existing structures, except shaft timbering, shall not be used as load-bearing devices. <br /> PROJECT WORK DESCRIPTION <br /> The attached General Conditions apply to all work. The attached Purchase Order Terms and <br /> Conditions or the Construction Agreement apply to all work depending on award amount. <br /> The following descriptions delineate the Work, materials, and how measurements of completed <br /> Work will be made and paid for, for each bid item in the Bid Schedule. The Bidder is to read <br /> these definitions and price their proposal accordingly. <br /> ITEM 1.0: MOBILIZATION & DEMOBILIZATION <br /> This item includes those measures necessary and incidental to move equipment and supplies <br /> onto the Project Area, to move equipment within the Project Area, and to complete any other <br /> requirements necessary to accomplish the goals of this Project. This item also includes all labor, <br /> equipment, and costs associated with demobilization and clean-up of the work site following <br /> completion of the Project. Please see Specification 1.0, Mobilization / Demobilization of the <br /> General Bid Specifications, 2009. <br /> CONTRACTOR must comply with the following provisions during performance of this Project: <br /> No clearing will be conducted without prior approval of the PROJECT MANAGER and without <br /> approved functional sediment control structures in place. Generally, silt fence, installed per <br /> manufacturer's specifications and Section 22.4 of the General Bid Specifications, 2009 is <br /> acceptable as a sediment control measure. Sediment controls must be maintained to ensure <br /> effectiveness for the duration of the project. <br /> CONTRACTOR will dispose of waste materials, including but not limited to refuse, garbage, <br /> sanitary wastes, spent solvents; oil and other petroleum products off of the Project Area in <br /> accordance with applicable laws and regulations. CONTRACTOR will specify to PROJECT <br /> MANAGER proposed methods for all waste collection and disposal, modes of waste transport, <br /> and waste disposal facilities and locations CONTRACTOR and subcontractors will use while <br /> performing the work, including making any necessary arrangements for waste collection and <br /> disposal. Any fees or charges required to be paid for collection, transport or disposal of waste <br /> materials shall be paid by CONTRACTOR. <br /> At its expense, CONTRACTOR will comply with all applicable federal, state, and local laws, <br /> ordinances, rules and regulations relating to the work, the site, and any materials and/or <br /> equipment provided by CONTRACTOR. <br /> Upon completion of the work under this Contract, the CONTRACTOR shall remove all temporary <br /> facilities, temporary infrastructure and equipment. The CONTRACTOR shall remove from the <br /> work site all rubbish, unused materials, and leave all areas in good order and condition, subject <br /> to the approval of the PROJECT MANAGER. <br /> NOXIOUS WEEDS <br /> In an attempt to mitigate the spread of noxious weeds from one area to another, there will be a <br /> mandatory inspection of all equipment to be used during the course of construction at the project <br /> Rev. 07/07/2023 <br /> Page 9 of 20 <br />