My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-25_GENERAL DOCUMENTS - M1995005
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1995005
>
2023-07-25_GENERAL DOCUMENTS - M1995005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:53:54 PM
Creation date
1/3/2024 2:21:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995005
IBM Index Class Name
General Documents
Doc Date
7/25/2023
Doc Name Note
Ocean Wave Project ( Alps Jct)
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR shall give the Principal Representative timely notice of the date of inspection and <br /> copies of certificates of inspection being secured by the CONTRACTOR. <br /> Article 18. PRIME CONTRACTOR <br /> If several CONTRACTORS propose to join together to perform the work, the Principal <br /> Representative will recognize only one bonded prime CONTRACTOR, who will enter into a contract <br /> with the Principal Representative, and who will subcontract the work to such others as are required <br /> to perform the work, unless a "joint venture" arrangement between CONTRACTORS satisfactory to <br /> the Principal Representative has been executed. In this case, the "joint venture" shall be bonded in <br /> accordance with these General Conditions and shall designate a Superintendent with whom the <br /> Principal Representative can communicate and who will supervise the work and be fully responsible <br /> for the performance of the work. <br /> Article 19. SUPERINTENDENCE OF THE WORK <br /> The CONTRACTOR shall keep a competent and reliable superintendent on the job at all times that <br /> labor is being performed. The superintendent, in the CONTRACTOR'S absence from the site, shall <br /> stand in the stead of the CONTRACTOR and any authoritative directions given to the superintendent <br /> shall be as binding as if given to the CONTRACTOR. <br /> The CONTRACTOR shall give efficient supervision to the work, using his best skill and attention. He <br /> shall carefully study and compare all Drawings, Specifications and other instructions and shall at <br /> once report to the Principal Representative any error, inconsistency or omission which he may <br /> discover, but he shall not be liable to the Principal Representative for any damage resulting from any <br /> errors or deficiencies in the Contract Documents or other instructions by the Principal <br /> Representative. <br /> The CONTRACTOR shall see that the work is carried out in accordance with the Contract <br /> Documents and in a thorough and first-class manner in every respect. The CONTRACTOR shall <br /> establish all lines, levels, grades, and marks necessary to facilitate the operations of all concerned <br /> in such CONTRACTOR'S work. He shall lay out the work in a manner satisfactory to the Principal <br /> Representative. <br /> Article 20. SUBCONTRACTORS <br /> The CONTRACTOR shall submit to the Principal Representative, a complete list of subcontractors <br /> for the project, including the name of the proposed subcontractor and a description of the work to be <br /> subcontracted. The CONTRACTOR shall not, without prior written approval of the Principal <br /> Representative, enter into any subcontract covering any part of the work covered by this contract. <br /> If at any time the Principal Representative determines that any subcontractor is incompetent or <br /> undesirable, he shall notify the CONTRACTOR accordingly in writing and the CONTRACTOR shall <br /> take immediate steps for cancellation of the subcontract. <br /> Article 21. RELATIONS OF CONTRACTOR AND SUBCONTRACTOR <br /> The CONTRACTOR agrees to bind each subcontractor to the terms of these General Conditions <br /> and to the requirements of the drawings and specifications, and any amendments or change orders, <br /> Colorado Division of Reclamation, Mining and Safety <br /> Page 8 of 22 Pages <br /> Revised:9/17/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.