Laserfiche WebLink
Article 4. THREE-WAY AGREEMENT <br /> If a three-way Agreement for Reclamation Activities) is required, the CONTRACTOR shall enter into <br /> a three-way agreement between the CONTRACTOR, the State of Colorado and the private <br /> landowner, and maintain for the duration of the work, in addition to that specified above, additional <br /> insurance coverage of: <br /> a. Comprehensive General Liability Insurance, which includes operations & premises <br /> coverage, products/completed operation coverage, all on an occurrence basis, all with <br /> combined single limit of liability of$1,000,000; <br /> b. Statutory Worker's Compensation and Occupational Disease Disability Insurance; <br /> C. Employers' Liability Insurance with limits of$500,000 each occurrence; and <br /> d. Automobile Insurance with a combined single limit of liability of$1,000,000 and furnish <br /> evidence of the insurance coverage as prescribed the three-way agreement. <br /> If a three-way Agreement for Reclamation Activities is required, the CONTRACTOR will be required <br /> to furnish lien waivers to the private landowner. See Number 5 of the sample three-way Agreement <br /> for Reclamation Activities. The landowner's address will be furnished to the CONTRACTOR with the <br /> Notice to Proceed. <br /> Article 5. PROJECT SCHEDULE <br /> The successful bidder shall, prior to the execution of an Agreement, furnish a plan for construction <br /> of the work showing (1) the date(s) he expects to move various pieces of equipment onto the work <br /> site, and (2) the dates and period(s) he proposes to perform each phase of the project work. <br /> Article 6. APPLICANT VIOLATOR SYSTEM <br /> The successful bidder will be required to submit a completed AML Contractor Ownership and Control <br /> Form and pass a check of the Applicant Violator System (A VS). <br /> Although there are many circumstances under which a bidder might be found "not responsible", any <br /> CONTRACTOR who has had direct or indirect association with a firm that has had a permit revoked <br /> or a bond forfeited by the Division of Reclamation, Mining and Safety or the Mined Land Reclamation <br /> Board will be considered not responsible, and not eligible to be awarded any bid. Any firm listed in <br /> the federal Office of Surface Mining's Applicant Violator System or who is not confirmed by the Office <br /> of Surface Mining will be considered not responsible. <br /> Article 7. MINORITYIWOMEN BUSINESS PARTICIPATION <br /> The successful bidder is required to complete and return the Minority/Women Business Enterprise <br /> Participation Report Form before an Agreement will be executed. <br /> Article 8. NOTICE TO PROCEED <br /> After the Agreement has been fully executed, the Principal Representative will issue the Notice to <br /> Proceed consistent with the project dates in the Special Conditions. Under no circumstance shall the <br /> CONTRACTOR begin work before a Notice to Proceed is issued. <br /> Article 9. ACCIDENT PREVENTION AND SAFETY MEASURES <br /> Colorado Division of Reclamation, Mining and Safety <br /> Page 4 of 22 Pages <br /> Revised:9/17/2019 <br />