My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-25_GENERAL DOCUMENTS - M1995005
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1995005
>
2023-07-25_GENERAL DOCUMENTS - M1995005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:53:54 PM
Creation date
1/3/2024 2:21:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995005
IBM Index Class Name
General Documents
Doc Date
7/25/2023
Doc Name Note
Ocean Wave Project ( Alps Jct)
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS OF THE CONTRACT <br /> Article 1. DEFINITIONS <br /> A. Contract Documents. The Contract Documents consist of: <br /> (a) Agreement and Bid Schedule; <br /> (b) Performance and Payment Bonds; <br /> (c) Liability, Automobile and Workmen's Compensation Certificates of Insurance; <br /> (e) Notice to Proceed; <br /> (f) General Conditions of the Contract; <br /> (g) Detailed Special Conditions, including all amendments issued prior to the opening of <br /> the bids and including any applicable Standard Work Specifications; <br /> (h) Maps and drawings, including all amendments issued prior to the opening of the bids; <br /> (i) Final inspection and certificate of completion; <br /> Q) Notice of CONTRACTORS Settlement, and <br /> (k) List of Equipment Offered. <br /> B. Procedural Documents. The Procedural Documents consist of: <br /> (a) Advertisement for Bids; <br /> (b) Bid form; <br /> (c) Bid Bond; <br /> (d) Notice of Award; <br /> (e) MBE/WBE Forms; and <br /> (f) AML Contractor Ownership and Control Information Package (AVS); <br /> (g) Three-Way Agreement for Reclamation Activities, if required <br /> C. Correlation and Intent of the Documents <br /> The Contract Documents are complementary; what is called for by any one document shall be as <br /> binding as if called for by all. The intention of the documents is to include all labor and materials, <br /> equipment and transportation necessary for the proper execution of the work. Materials or work <br /> described in words which have a well-known technical or trade meaning shall be held to refer to such <br /> recognized standards. <br /> In case of a difference between the contract documents, precedence shall be given in the following <br /> respective order: Agreement, Special Conditions, Bid Schedule, Standard Work Specifications, <br /> Maps, Drawings, and General Conditions. Amendments shall take precedence in the area of the bid <br /> document which they modify or clarify. In the case of any such difference, the matter shall be <br /> promptly brought to the attention of the Principal Representative who will make a determination in <br /> writing. <br /> D. Words and Terms Used <br /> AGREEMENT - The word Agreement means the written Agreement entered into by the State of <br /> Colorado acting by and through the Principal Representative and the CONTRACTOR for the <br /> performance of the work and payment for the work. <br /> Colorado Division of Reclamation, Mining and Safety <br /> Page 1 of 22 Pages <br /> Revised:9/17/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.