My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-25_GENERAL DOCUMENTS - M1995005
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1995005
>
2023-07-25_GENERAL DOCUMENTS - M1995005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:53:54 PM
Creation date
1/3/2024 2:21:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995005
IBM Index Class Name
General Documents
Doc Date
7/25/2023
Doc Name Note
Ocean Wave Project ( Alps Jct)
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Upon receipt of the SHEAP, the OWNER will either accept the plan, or request that more detail <br /> be provided. <br /> The CONTRACTOR and their employees or sub-contractors are expected to follow the SHEAP <br /> during performance of every component of the Project. If the PROJECT MANAGER determines <br /> that the SHEAP is not being followed, either in whole or in part, the Project may be immediately <br /> suspended, without stopping the mob clock, until such time as the SHEAP is implemented. <br /> The following items must be addressed in the SHEAP: <br /> 1. Personal protective equipment (hard hats, steel toe boots, gloves, safety glasses, etc.) <br /> must be worn at all times and be appropriate for the tasks being performed; <br /> 2. First aid kits must be provided and maintained for the duration of the project; <br /> 3. Accident prevention and safety when operating motor vehicles and equipment; <br /> 4. Fall protection & prevention for all work conducted where fall hazards exist; <br /> 5. Overhead physical and electrical hazards; <br /> 6. Hot work safety procedures and fire prevention; <br /> 7. Welding fumes, exhaust, and vapor protection; <br /> 8. Prevention and clean-up of environmental contamination; <br /> 9. Alcohol and drugs are not permitted on the job site; <br /> 10.Accident reporting; <br /> 11. Daily safety meetings; <br /> CONTRACTOR shall provide a signature block similar to the one below that each <br /> employee can sign to verify that they have read and understand the safety aspects of the <br /> project, and accept the provisions of the SHEAP. <br /> Contractor Representative: <br /> Signature Date <br /> Employee: <br /> Signature Date <br /> Measurement and Payment <br /> There will be no measurement for payment for this task. Payment shall be for the lump sum bid <br /> price under Item 2.0 of the Bid Schedule. This lump sum bid will cover all costs for developing <br /> and implementing the SHEAP, including writing and revising the plan as required, provisions <br /> and maintenance of safety equipment and personnel, conduct of daily safety meetings, <br /> employee training, and all other items necessary and incidental to fulfilling the requirements of <br /> this task and of the SHEAP. Payment for this task will only be made on the final invoice (before <br /> retainage) following completion of all work and upon approval from the PROJECT MANAGER. <br /> Rev. 07/07/2023 <br /> Page 11 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.