Laserfiche WebLink
CONDITIONS AFFECTING THE WORK <br /> In addition to examining the drawings and specifications, completion schedule, and <br /> other instructions, bidders shall visit the site and take such other steps as may be <br /> reasonably necessary to ascertain the nature and location of the work, including <br /> average climatic conditions and the general and local conditions which can affect the <br /> work or the cost thereof. Failure to do so will not relieve bidders from responsibility for <br /> estimating properly the difficulty or cost of successfully performing the work. <br /> PROJECT FUNDING <br /> This project is funded through monies made available to the State of Colorado through <br /> revocation of bond monies retained by the Division of Reclamation, Mining and Safety <br /> for reclamation of this previously permitted mining operation and by Severance Tax <br /> collected by the State of Colorado. <br /> AMERICANS WITH DISABILITIES ACT <br /> All programs, services and activities of the Department of Natural Resources, Division <br /> of Reclamation, Mining and Safety and the Colorado Mined Land Reclamation Board <br /> are operated in compliance with the Americans with Disabilities Act. Details can be <br /> found online at https://dnr.colorado.gov/accessibility. <br /> CORA DISCLOSURE <br /> To the extent not prohibited by federal law, this Contract and the performance measures <br /> and standards under CRS 24-103.5-101, if any, are subject to public release through the <br /> Colorado Open Records Act, CRS 24-72-101, et.seq. <br /> PROJECT WORK DESCRIPTION <br /> The attached General Conditions of the Contract and Purchase Order Terms and <br /> Conditions apply to all work. <br /> ITEM 1.0 MOBILIZATION/DEMOBILIZATION <br /> This item includes those measures necessary and incidental to move equipment and <br /> supplies onto the Project Area, to move equipment within the Project Area, and to <br /> complete any other requirements necessary to accomplish the goals of this Project. This <br /> item also includes all labor, equipment, and costs associated with demobilization and <br /> clean-up of the work site following completion of the Project. Please see Specification <br /> 1.0, Mobilization / Demobilization of the General Bid Specifications, 2009. <br /> CONTRACTOR must comply with the following provisions during performance of this <br /> Project: <br /> Page 6of11 <br />