My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-06-23_GENERAL DOCUMENTS - M2004045
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2004045
>
2023-06-23_GENERAL DOCUMENTS - M2004045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:53:28 PM
Creation date
1/3/2024 2:14:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004045
IBM Index Class Name
General Documents
Doc Date
6/23/2023
Doc Name Note
Hanna Bond Forefeiture Project
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The project is scheduled for construction between September 18th, 2023 and October <br /> 17th, 2023. This includes ten (10) days mobilization time. These dates are tentative and <br /> may change. <br /> TIME OF COMPLETION <br /> The time of completion allowed for the project is (30) calendar days after receipt of the <br /> Notice to Proceed. This includes ten (10) days mobilization time. <br /> NOTICE OF AWARD AND EXECUTION OF DOCUMENTS <br /> A Notice of Award will be sent to the apparent low bidder within a reasonable time <br /> following the bid submission deadline. The Division of Reclamation, Mining and Safety <br /> must receive the following by the date specified in the award letter: <br /> (a) Certificates of Insurance showing proof of required coverage and <br /> Additional Insured Endorsement; <br /> (b) AML Contractor Ownership and Control Form, if required; <br /> (c) Three-Way Agreement for Reclamation Activities, if required; <br /> (d) Completed W-9 form, (for contractors new to the State); <br /> (e) Completed EFT Form- required as of 4/15/2018. <br /> Please consult Articles 2-7 of the General Conditions. <br /> If the above documents are not submitted properly by the date specified in the award <br /> letter, the Division of Reclamation, Mining and Safety may elect to award the project to <br /> the next lowest bidder. <br /> INSURANCE <br /> A. The Contractor shall obtain and maintain, at all times during the term of this <br /> contract and require Subcontractors to include insurance in the kinds and amounts <br /> specified below. All insurance policies required herein shall be issued by <br /> insurance companies as approved by the State. <br /> 1. Workers' Compensation Insurance as required by state statute, and <br /> Employer's Liability Insurance covering all of Contractor's or <br /> Subcontractor's employees acting within the course and scope of <br /> their employment. <br /> 2. Commercial General Liability Insurance written on ISO occurrence form CG <br /> 00 01 10/93 or equivalent, covering premises operations, fire damage, <br /> independent contractors, products and completed operations, blanket <br /> contractual liability, personal injury, and advertising liability with minimum <br /> limits as follows: <br /> Page 4 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.