Laserfiche WebLink
RIO GRANDE CIVIL LLC. <br /> DAILY LOG SHEET <br /> JOB: Hanna Pit Reclamation <br /> 1. 9-25-23 Safety Meeting on equipment and working around high walls. Mobilized equipment <br /> onto job site. Did a walk around orientation of the job to be performed. Started knocking <br /> down high walls. Started transporting top soil and placing on banks. <br /> 2. 9-26-23 Safety Meeting on equipment and surroundings. Finished knocking down high walls <br /> and transporting and placing top soil to the banks and bottom of the pit. <br /> 3. 9-27-23 Spread seed for revegetation and partially covered over. <br /> 4. 9-28-23 Demobilized equipment. <br />