My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-18_GENERAL DOCUMENTS - M1977377
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977377
>
2023-08-18_GENERAL DOCUMENTS - M1977377
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:52:58 PM
Creation date
1/3/2024 1:56:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977377
IBM Index Class Name
General Documents
Doc Date
8/18/2023
Doc Name Note
Monarch Bond Forfeiture Project
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The project will involve constructing a 500 foot long run-on control berm, grading 2 acres of land, <br /> incorporating material into the graded area, revegetation, and constructing rolled dips on an <br /> existing road. <br /> ITEM 1.0 MOBILIZATION/DEMOBILIZATION <br /> This item includes those measures necessary and incidental to move equipment and supplies <br /> onto the Project Area, to move equipment within the Project Area, and to complete any other <br /> requirements necessary to accomplish the goals of this Project. This item also includes all labor, <br /> equipment, and costs associated with demobilization and clean-up of the work site following <br /> completion of the Project. Please see Specification 1.0, Mobilization / Demobilization of the <br /> General Bid Specifications, 2009. <br /> Contractor must comply with the following provisions during performance of this Project: <br /> No clearing will be conducted without prior approval of the Project Manager and without an <br /> approved sediment control structure in place and functional, as required by Project Manager, <br /> until construction is completed. Generally, silt fence, installed per manufacturer's specifications <br /> and Section 22.4 of the General Bid Specifications, 2009 is acceptable as a sediment control <br /> measure. <br /> Contractor will dispose of waste materials, including but not limited to refuse, garbage, sanitary <br /> wastes, spent solvents; oil and other petroleum products off of the Project Area in accordance <br /> with applicable laws and regulations. Contractor will specify to Project Manager proposed <br /> methods for all waste collection and disposal, modes of waste transport, and waste disposal <br /> facilities and locations Contractor and subcontractors will use while performing the work, <br /> including making any necessary arrangements for waste collection and disposal. Any fees or <br /> charges required to be paid for collection, transport or disposal of waste materials shall be paid <br /> by Contractor. <br /> At its expense, Contractor will comply with all applicable federal, state, and local laws, <br /> ordinances, rules and regulations relating to the work, the site, and any materials and/or <br /> equipment provided by Contractor. <br /> Upon completion of the work under this Contract, the Contractor shall remove all temporary <br /> facilities, temporary infrastructure and equipment. The Contractor shall remove from the work <br /> site all rubbish, unused materials, and leave all areas in good order and condition, subject to the <br /> approval of the Project Manager. <br /> NOXIOUS WEEDS <br /> In an attempt to mitigate the rampant spread of noxious weeds from one area to another, there <br /> will be a mandatory inspection of all equipment to be used during the course of construction at <br /> the project site. Prior to inspection, it is the responsibility of the Contractor to employ whatever <br /> cleaning methods are necessary to ensure that all equipment is free of soil, seeds, vegetative <br /> Page 9 of 16 <br /> 7/23/23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.