complete any other requirements necessary to accomplish the goals of this Project. This <br /> item also includes all labor, equipment, and costs associated with demobilization and <br /> clean-up of the work site following completion of the Project. Please see Specification <br /> 1.0, Mobilization / Demobilization of the General Bid Specifications, 2009. <br /> CONTRACTOR must comply with the following provisions during performance of this <br /> Project: <br /> No clearing will be conducted without prior approval of the PROJECT MANAGER and <br /> without an approved sediment control structure in place and functional, as required by <br /> PROJECT MANAGER, until construction is completed. Generally, silt fence, installed per <br /> manufacturer's specifications and Section 22.4 of the General Bid Specifications, 2009 is <br /> acceptable as a sediment control measure. <br /> CONTRACTOR will dispose of waste materials, including but not limited to refuse, <br /> garbage, sanitary wastes, spent solvents; oil and other petroleum products off of the <br /> Project Area in accordance with applicable laws and regulations. CONTRACTOR will <br /> specify to PROJECT MANAGER proposed methods for all waste collection and disposal, <br /> modes of waste transport, and waste disposal facilities and locations CONTRACTOR and <br /> subcontractors will use while performing the work, including making any necessary <br /> arrangements for waste collection and disposal. Any fees or charges required to be paid <br /> for collection, transport or disposal of waste materials shall be paid by CONTRACTOR. <br /> At its expense, CONTRACTOR will comply with all applicable federal, state, and local <br /> laws, ordinances, rules and regulations relating to the work, the site, and any materials <br /> and/or equipment provided by CONTRACTOR. <br /> Upon completion of the work under this Contract, the CONTRACTOR shall remove all <br /> temporary facilities, temporary infrastructure and equipment. The CONTRACTOR shall <br /> remove from the work site all rubbish, unused materials, and leave all areas in good order <br /> and condition, subject to the approval of the PROJECT MANAGER. <br /> NOXIOUS WEEDS <br /> In an attempt to mitigate the rampant spread of noxious weeds from one area to another, <br /> there will be a mandatory inspection of all equipment to be used during the course of <br /> construction at the project site. Prior to inspection, it is the responsibility of the <br /> CONTRACTOR to employ whatever cleaning methods are necessary to ensure that all <br /> equipment is free of soil, seeds, vegetative matter, or other debris that could contain or <br /> hold seeds. Equipment shall be considered clean when a visual inspection determines <br /> the equipment free of such material. The CONTRACTOR will be required to notify the <br /> PROJECT MANAGER in advance of mobilizing equipment on site to arrange for <br /> inspection. Disassembly of equipment components will not be required. <br /> Measurement and Payment <br /> Payment for Item 1.0 shall be reflected in a lump sum quote price under Item 1.0 on the <br /> Bid Schedule. Payment shall include all the CONTRACTOR'S expenses for mobilization <br /> Page 7 of 13 <br /> Rev.7/15/2022 <br />