My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-23_GENERAL DOCUMENTS - P1950005
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P1950005
>
2022-07-23_GENERAL DOCUMENTS - P1950005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:52:47 PM
Creation date
1/3/2024 1:42:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P1950005
IBM Index Class Name
General Documents
Doc Date
7/23/2022
Doc Name Note
Nancy Mines Project
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 4.0 DEBRIS/EQUIPMENT REMOVAL <br /> Numerous tools, fuel, batteries and equipment, including portable generators, remain on <br /> site. Contractor will remove all debris and equipment, as specified by the PROJECT <br /> MANAGER and dispose of materials in an authorized waste disposal facility. All fuel and <br /> other fluids will be extracted from the generators prior to removing them. Fuel and other <br /> fluids will be removed from the site in leak-proof receptacles and disposed of in an <br /> authorized waste disposal facility. <br /> Measurement and Payment <br /> Payment for TASK 4.0 shall be reflected in a lump sum quote price under TASK 4.0 on <br /> the Bid Schedule. Payment shall include all the CONTRACTOR'S expenses for <br /> mobilization of equipment to the site, transportation of the equipment within the project <br /> area, employee time, labor and materials necessary to accomplish the requirements of <br /> this item, compliance with the conditions and requirements described in this item <br /> description, and final clean-up of the work place. <br /> MASON MINE <br /> TASK 5.0 REVEGETATION OF MASON MINE <br /> The waste pile associated with the Mason Mine will be seeded with a native seed mix. <br /> Seed will be hand broadcast and incorporated by hand. The estimated total area to be <br /> revegetated is six hundred square feet (600 sf.). Seed will be provided by PROJECT <br /> MANAGER. CONTRACTOR will supply the labor and equipment necessary for <br /> completion of this Task in accordance with Section 20.0, of the General Bid <br /> Specifications 2009. Mulch and fertilizer are NOT required. <br /> Measurement and Payment <br /> Payment for TASK 5.0 shall be reflected in a lump sum quote price under TASK 5.0 on <br /> the Bid Schedule. Payment shall include all the CONTRACTOR'S expenses for <br /> mobilization of equipment to the site, transportation of the equipment within the project <br /> area, employee time, labor and materials necessary to accomplish the requirements of <br /> this item, compliance with the conditions and requirements described in this item <br /> description, and final clean-up of the work place. <br /> PROJECT OBSERVATION <br /> The PROJECT MANAGER will be at the project site periodically to monitor construction <br /> activities and ensure that each work item is completed and constructed to design <br /> specifications. The PROJECT MANAGER will be available during regular business hours <br /> (8.00 A.M. to 5.00 P.M.) on weekdays. Inspections will not be scheduled on weekend days <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.