My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-07_GENERAL DOCUMENTS - M1981184
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1981184
>
2014-10-07_GENERAL DOCUMENTS - M1981184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:52:18 PM
Creation date
1/3/2024 1:25:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981184
IBM Index Class Name
General Documents
Doc Date
10/7/2014
Doc Name Note
Red Arrow Forfeiture Project
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Description <br /> The attached General Conditions of the Contract and Purchase Order Terms and Conditions <br /> apply to all work. <br /> ITEM 1.0 MOBILIZATION/ DEMOBILIZATION <br /> This item includes all costs necessary and incidental to move equipment and supplies onto the <br /> project area, perform minimal road improvements, if required, move equipment within the <br /> project area during prosecution of the project, and any other requirements necessary for the <br /> successful completion of this project per Section 1.0 of the General Bid Specifications 2009. <br /> The CONTRACTOR shall also operate and maintain such temporary works and equipment <br /> throughout the period of construction. This item also includes all labor, equipment, and costs <br /> associated with the demobilization and clean-up of the project site following the completion of <br /> the project. Applicable temporary works, such as sanitation facilities, shall fully comply with all <br /> rules and regulations. <br /> Noxious Weeds <br /> To mitigate the rampant spread of noxious weeds from one area to another, there will be a <br /> mandatory inspection of all equipment and vehicles to be used during the course of construction <br /> at the project site. Prior to inspection, it is the responsibility of the Contractor to employ <br /> whatever cleaning methods are necessary to ensure that all equipment is free of soils, seeds, <br /> vegetative matter and other debris that could contain or hold seeds. Equipment shall be <br /> considered clean when a visual inspection determines the equipment free of such materials. <br /> The CONTRACTOR will be required to notify the PROJECT MANAGER in advance of <br /> mobilizing equipment on site to arrange for inspection in Mancos, CO. Disassembly of <br /> equipment components will not be required. <br /> Measurement and payment <br /> No measurement for payment shall be made for mobilization and demobilization. Equipment <br /> cleaning and inspection costs for noxious weed mitigation shall be included in the <br /> Mobilization/Demobilization bid item. Payment of two-thirds of the lump sum price bid for Item <br /> 1.0 of the Bid Schedule shall be made with the first monthly progress payment after completion <br /> of the work described above for mobilization. Payment of one-third of the lump sum price bid for <br /> mobilization will be made with the progress payment following completion of all work. In the <br /> event the price bid for mobilization and demobilization items is greater than 15 percent (15%) of <br /> the total contract price, original invoices supporting the mobilization costs will be required before <br /> payment is approved. <br /> Remobilization, if required, will be paid in accordance with the General Bid Specifications <br /> Section 1.4.4. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.