My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-07_GENERAL DOCUMENTS - M1981184
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1981184
>
2014-10-07_GENERAL DOCUMENTS - M1981184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:52:18 PM
Creation date
1/3/2024 1:25:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981184
IBM Index Class Name
General Documents
Doc Date
10/7/2014
Doc Name Note
Red Arrow Forfeiture Project
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT DATES <br /> The project is scheduled for construction between May 1, 2015 and May 30, 2015. This <br /> includes ten (10) days mobilization time. These dates are tentative and may change. <br /> TIME OF COMPLETION <br /> The time of completion allowed for the project is thirty (30) calendar days after receipt of the <br /> Notice to Proceed. This includes ten (10) days mobilization time. <br /> LIQUIDATED DAMAGES <br /> The liquidated damages for this project will be $400.00 per day. Please see General <br /> Conditions, Article 39. <br /> NOTICE OF AWARD AND EXECUTION OF DOCUMENTS <br /> A Notice of Award will be sent to the apparent low bidder with reasonable promptness. The <br /> contract signing date and time will be set for fourteen (14) days after the bid is awarded. The <br /> Division of Reclamation, Mining and Safety must receive the following: <br /> (a) Executed Agreement; <br /> (b) Fully-executed Performance and Payment Bonds, accompanied by appropriate <br /> Power of Attorney, if required; <br /> (c) Certificates of Insurance showing proof of required coverage and Additional <br /> Insured Endorsement; <br /> (d) Project schedule; <br /> (e) AML Contractor Ownership and Control Form; <br /> (f) Minority(MBE)/women (WBE) Business Participation form; <br /> (g) Three-Way Agreement for Reclamation Activities, if required by the Special <br /> Conditions; <br /> (h) A list of all subcontractors to be used on the project, the work tasks and dollar <br /> value to be subcontracted to each, and <br /> (1) Completed W-9 forms, if required (for contractors new to the State). <br /> (j) Project Schedule <br /> Please consult Articles 2-7 of the General Conditions. <br /> If the above documents are not submitted properly by the contract signing date, the Division of <br /> Reclamation, Mining and Safety may elect to award the contract to the next lowest bidder. <br /> Bidders are advised to keep close contact with CDRMS during this period. <br /> THREE-WAY AGREEMENT <br /> A three way "Agreement for Reclamation Activities" is not required for this job. Please see <br /> Article 4 of the General Conditions for the applicable insurance requirements. <br /> CONDITIONS AFFECTING THE WORK <br /> In addition to examining the drawings and specifications, completion schedule, and other instructions, <br /> bidders shall visit the site and take such other steps as may be reasonably necessary to ascertain the <br /> nature and location of the work, including average climatic conditions and the general and local conditions <br /> which can affect the work or the cost thereof. Failure to do so will not relieve bidders from responsibility <br /> for estimating properly the difficulty or cost of successfully performing the work. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.