My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-01-03_REVISION - M2012023
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012023
>
2024-01-03_REVISION - M2012023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2024 8:04:38 AM
Creation date
1/3/2024 8:09:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012023
IBM Index Class Name
Revision
Doc Date
1/3/2024
Doc Name
Notice of Surety Increase
From
Brent Tamburelli - Tamrock Gravel LLC
To
DRMS
Type & Sequence
SI1
Email Name
AMG
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br /> Task description: Spread 4"Topsoil over 10 acre disturbance <br /> Site: Shot Rock Pit Permit Action: 2023 Inspection Permit/Job#: M2012023 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 12/4/2023 County: Las Animas Filename: M023-003 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $241.38 NA <br /> Operating Cost/Hour: $143.92 100 <br /> Ripper own. $14.11 NA <br /> Cost/Hour: <br /> Ripper op. Cost/Hour: $3.73 50 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $444.44 <br /> Total Fleet Cost/Hour: $444.44 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 1,613 <br /> Swell factor: 1.000 <br /> Loose volume: 1,613 LCY <br /> Source of estimated volume: —10 acres of dstbd area,4"root zone cover needed <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 200 feet <br /> Unadjusted hourly 491.9 LCY/hr <br /> production: <br /> Materials consistency Partly consolidated stockpile 1.1 <br /> description: <br /> Average push -15 % <br /> gradient: <br /> Average site altitude: 6,800 feet <br /> Material weight: 1,600 lbs/LCY <br /> Weight description: Top Soil <br />
The URL can be used to link to this page
Your browser does not support the video tag.